Upgrade Plan
Get upgrade quotesThis certificate lists these measures but records the same score with and without them, so there is no saving or rating gain to attribute to any one of them. That usually means the assessment was incomplete — here the assessor recorded no heating system at all. The costs below are real; a fresh assessment would be the way to find the gain.
| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Low energy lighting | — | £10 | — | — | — |
Grants verified 20 August 2026. Costs are the register’s indicative ranges.
Running costs
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2019, states £385 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
No sale recorded for this address since 1995.
Schools nearby
The schools’ own performance — Progress 8 shows value added, not just raw results.
| School | Phase | Distance | Progress |
|---|---|---|---|
| Dial Park Primary School | Primary | 0.2 mi | — |
| St Philip's Catholic Primary School, a Voluntary Academy | Primary | 0.2 mi | — |
| Fairway Primary School | Primary | 0.6 mi | — |
| Stockport School | Secondary | 0.8 mi | Progress 8 +0.25 · above average (2023/24) |
| Marple Hall School | Secondary | 1.4 mi | Not in the KS4 performance tables |
| Werneth School | Secondary | 1.6 mi | Progress 8 -0.45 · below average (2023/24) |
Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.