1 Jethro Street, Bradshaw, Bolton BL2 3DE

End-Terrace house · Built before 1900 · 76 m² · Owner-Occupied · Boiler and radiators, mains gas

Upgrade Plan

EC for £22,540 · £11,270 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Low energy lighting£40£75.6 yrs+0.3 pts
Floor insulation£800 – £1,200£1636.1 yrs+7.0 pts
Cavity wall insulation£500 – £1,500£1228.2 yrs+5.2 pts
Solar water heating£4,000 – £6,000£12639.6 yrs+5.4 pts · reaches D
Solar photovoltaic panels£5,000 – £8,000£15143.2 yrs+6.5 pts
Solid wall insulation£4,000 – £14,000£17650+ yrs+7.6 pts · reaches C

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£2,058
per year at grade E
£1,314
per year at grade C

The full plan saves £744 a year — a 3.3% annual return on £22,540.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2015, states £1,446 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

26 January 2012£69,500
2 April 2004£86,500
22 October 1999£44,500
4 October 1996£41,000

Estimated today: £137,161 HPI-indexed estimate, not a valuation

Jethro Street: 4 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
St Columba's RC Primary SchoolPrimary0.3 mi
St Maxentius CofE Primary SchoolPrimary0.5 mi
Castle Hill Primary SchoolPrimary0.7 mi
Canon Slade SchoolSecondary0.1 miProgress 8 +0.29 · above average (2023/24)
Turton SchoolSecondary0.8 miProgress 8 +0.08 · average (2023/24)
Sharples SchoolSecondary0.8 miProgress 8 +0.86 · well above average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.