Upgrade Plan
Get upgrade quotes| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Low energy lighting(optional, beyond B) | — | £18 | £0 | 44.1 yrs | +0.0 pts |
| Wind turbine(optional, beyond B) | — | £1,500 – £4,000 | £8 | 50+ yrs | +0.3 pts |
| Solar water heating(optional, beyond B) | — | £4,000 – £6,000 | £7 | 50+ yrs | +0.3 pts |
| Solar photovoltaic panels(optional, beyond B) | — | £11,000 – £20,000 | £9 | 50+ yrs | +0.4 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
£303
per year at grade B
£279
per year at grade B
Energy costs as modelled on the certificate, not a bill. This fuel has too few recent certificates to restate at today's prices.
Sold prices
22 April 2022£210,000
13 September 2013£149,995
Estimated today: £225,886 HPI-indexed estimate, not a valuation
Schools nearby
No school in the register within reach of this postcode.