| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Cavity wall insulation | — | £500 – £1,500 | £36 | 28.1 yrs | +3.6 pts |
| Solar photovoltaic panels | — | £3,500 – £5,500 | £44 | 50+ yrs | +4.5 pts · reaches C |
| Solar water heating(optional, beyond C) | — | £4,000 – £6,000 | £37 | 50+ yrs | +3.7 pts |
| Solid wall insulation(optional, beyond C) | — | £4,000 – £14,000 | £51 | 50+ yrs | +5.2 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
£1,200
per year at grade D
£1,032
per year at grade C
The full plan saves £80 a year — a 1.5% annual return on £5,500.
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2024, states £1,258 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
15 December 1998£38,000
12 May 1995£29,000
Estimated today: £183,076 HPI-indexed estimate, not a valuation
Schools nearby
No school in the register within reach of this postcode.