3 Hadley Street, Salford M6 6BT

End-Terrace house · Built 1930-1949 · 100 m² · Rented (Private) · Boiler and radiators, mains gas

Upgrade Plan

DB for £25,125 · £12,563 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Loft insulation£100 – £350£713.2 yrs+2.5 pts
Heating controls£350 – £450£547.4 yrs+1.9 pts
Cavity wall insulation£500 – £1,500£1119.0 yrs+3.9 pts
Solar photovoltaic panels£3,500 – £5,500£13732.8 yrs+4.8 pts · reaches C
Floor insulation£4,000 – £6,000£14833.7 yrs+5.2 pts
Solar water heating£4,000 – £6,000£11543.4 yrs+4.0 pts
Solid wall insulation£4,000 – £14,000£16050+ yrs+5.6 pts · reaches B

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,801
per year at grade D
£1,004
per year at grade B

The full plan saves £797 a year — a 3.2% annual return on £25,125.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2020, states £1,135 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

21 June 2022£150,000
18 October 2004£42,000
25 February 2004£30,000
25 July 2000£28,000
12 January 2000£12,500

Estimated today: £168,711 HPI-indexed estimate, not a valuation

Hadley Street: 6 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
St Sebastian's RC Primary SchoolPrimary0.1 mi
St George's CofE Primary SchoolPrimary0.2 mi
Lower Kersal Community Primary SchoolPrimary0.3 mi
The Albion AcademySecondary0.2 miProgress 8 -0.04 · average (2023/24)
Buile Hill AcademySecondary1.0 miAttainment 8 42.9 · no Progress 8 published
Beis Yaakov High SchoolSecondary1.2 miProgress 8 +0.88 · well above average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.