Upgrade Plan
Get upgrade quotes| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Hot water cylinder insulation(optional, beyond C) | — | £15 – £30 | £75 | 0.3 yrs | +2.1 pts |
| Floor insulation(optional, beyond C) | — | £800 – £1,200 | £88 | 11.4 yrs | +2.5 pts |
| Heating controls(optional, beyond C) | — | £350 – £450 | £32 | 12.5 yrs | +0.9 pts |
| Band A condensing boiler(optional, beyond C) | — | £2,200 – £3,000 | £54 | 48.3 yrs | +1.5 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
£828
per year at grade C
£580
per year at grade C
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2024, states £868 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
9 May 2025£156,000
31 August 2004£117,950
6 June 2002£99,000
9 January 2001£59,950
23 October 1998£39,950
Estimated today: £154,467 HPI-indexed estimate, not a valuation
Schools nearby
No school in the register within reach of this postcode.