3 Beeches, Heywood OL10 1HD

End-Terrace house · Built before 1900 · 135 m² · Owner-Occupied · Boiler and radiators, mains gas

Upgrade Plan

DC for £5,420 · £5,420 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Low energy lighting£20£63.2 yrs+0.2 pts
Floor insulation£1,200 – £200£1415.0 yrs+4.0 pts
Room-in-roof insulation£2,700 – £700£1958.7 yrs+5.6 pts
Solar water heating£6,000 – £0£11027.4 yrs+3.1 pts · reaches C
Solar photovoltaic panels(optional, beyond C)£8,000 – £0£13130.6 yrs+3.7 pts
Solid wall insulation(optional, beyond C)£14,000 – £0£15345.8 yrs+4.4 pts

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£2,309
per year at grade D
£1,573
per year at grade C

The full plan saves £452 a year — a 8.3% annual return on £5,420.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2018, states £1,484 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

5 April 2019£188,750

Estimated today: £311,561 HPI-indexed estimate, not a valuation

Beeches: 2 sales since 1995 · £193,375 average over 10 years

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Harwood Park Primary SchoolPrimary0.3 mi
St Joseph's Roman Catholic Primary School Rochdale, a Voluntary AcademyPrimary0.3 mi
Woodland Community Primary SchoolPrimary0.4 mi
Holy Family Roman Catholic and Church of England CollegeSecondary0.3 miProgress 8 -0.32 · below average (2023/24)
Newhouse AcademySecondary0.7 miProgress 8 -0.36 · below average (2023/24)
Matthew Moss High SchoolSecondary1.6 miProgress 8 -0.03 · average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.