Crossfield Barn, Gandy Lane, Rochdale OL12 6EF

Semi-Detached house · Built before 1900 · 150 m² · Owner-Occupied · Boiler and radiators, mains gas

Upgrade Plan

EA for £28,255 · £7,064 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Room-in-roof insulation£2,700 – £700£3764.5 yrs+10.5 pts · reaches D
Low energy lighting£55£124.6 yrs+0.3 pts
Flat roof insulation£1,500 – £500£2074.8 yrs+5.8 pts
Floor insulation£6,000 – £0£27211.0 yrs+7.6 pts · reaches C
Solar photovoltaic panels£5,500 – £500£25211.9 yrs+7.1 pts
Solid wall insulation£14,000 – £0£29523.8 yrs+8.3 pts · reaches B
Wind turbine£25,000 – £0£22650+ yrs+6.3 pts · reaches A

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£3,379
per year at grade E
£1,739
per year at grade A

The full plan saves £1,640 a year — a 5.8% annual return on £28,255.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2019, states £2,124 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

18 April 2019£350,000
31 March 2016£276,000
15 August 2008£315,000
19 November 1999£115,000

Estimated today: £571,683 HPI-indexed estimate, not a valuation

Gandy Lane: 5 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Shawclough Community Primary SchoolPrimary0.4 mi
Healey Foundation Primary SchoolPrimary0.6 mi
Tonacliffe Primary SchoolPrimary0.7 mi
Falinge Park High SchoolSecondary0.9 miNot in the KS4 performance tables
Whitworth Community High SchoolSecondary1.4 miProgress 8 -0.08 · average (2023/24)
Oulder Hill Leadership AcademySecondary1.4 miProgress 8 -0.11 · average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.