| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Low energy lighting | — | £15 | £8 | 1.8 yrs | +0.3 pts |
| Floor insulation | — | £800 – £1,200 | £193 | 5.2 yrs | +7.3 pts · reaches D |
| Solar water heating | — | £4,000 – £6,000 | £150 | 33.4 yrs | +5.7 pts |
| Solid wall insulation | — | £4,000 – £14,000 | £209 | 43.1 yrs | +7.9 pts · reaches C |
| Solar photovoltaic panels(optional, beyond C) | — | £9,000 – £14,000 | £179 | 50+ yrs | +6.8 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
£1,985
per year at grade E
£1,246
per year at grade C
The full plan saves £560 a year — a 3.7% annual return on £15,015.
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2013, states £1,212 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
11 August 2004£119,500
20 November 2002£56,000
10 December 1996£11,000
Estimated today: £232,347 HPI-indexed estimate, not a valuation
Schools nearby
No school in the register within reach of this postcode.