2 Brinnington Crescent, Stockport SK5 8AB

Semi-Detached house · Built 1950-1966 · 98 m² · Owner-Occupied · Boiler and radiators, mains gas

Upgrade Plan

DB for £13,920 · £6,960 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Low energy lighting£20£54.2 yrs+0.2 pts
Floor insulation£800 – £1,200£1089.2 yrs+4.9 pts · reaches C
Heating controls£350 – £450£3910.2 yrs+1.8 pts
Cavity wall insulation£500 – £1,500£8112.4 yrs+3.7 pts
Solar water heating£4,000 – £6,000£8450+ yrs+3.8 pts
Solar photovoltaic panels£5,000 – £8,000£10050+ yrs+4.6 pts · reaches B

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,445
per year at grade D
£1,028
per year at grade B

The full plan saves £417 a year — a 3.0% annual return on £13,920.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2019, states £916 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

18 November 2019£225,000
24 March 2004£92,500

Estimated today: £309,053 HPI-indexed estimate, not a valuation

Brinnington Crescent: 5 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
St Paul's Church of England Primary School BrinningtonPrimaryunder 0.1 mi
St Bernadette's Catholic Primary SchoolPrimary0.2 mi
Westmorland Primary SchoolPrimary0.6 mi
Reddish Vale High SchoolSecondary1.2 miProgress 8 -0.29 · below average (2023/24)
St Anne's RC Voluntary AcademySecondary1.2 miProgress 8 -0.20 · average (2023/24)
Werneth SchoolSecondary1.5 miProgress 8 -0.45 · below average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.