Upgrade Plan
Get upgrade quotes| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Low energy lighting(optional, beyond D) | — | £13 | £2 | 5.7 yrs | +0.1 pts |
| Band A condensing boiler(optional, beyond D) | — | £1,500 – £3,500 | £32 | 50+ yrs | +1.0 pts |
| Solar water heating(optional, beyond D) | — | £4,000 – £6,000 | £41 | 50+ yrs | +1.3 pts |
| Solar photovoltaic panels(optional, beyond D) | — | £11,000 – £20,000 | £49 | 50+ yrs | +1.6 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2012, states £772 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
Estimated today: £293,505 HPI-indexed estimate, not a valuation
Windmill Close: 4 sales since 1995
Schools nearby
The schools’ own performance — Progress 8 shows value added, not just raw results.
| School | Phase | Distance | Progress |
|---|---|---|---|
| Dane Bank Primary School | Primary | 0.4 mi | — |
| Denton West End Primary School | Primary | 0.4 mi | — |
| Vale View Primary School | Primary | 0.7 mi | — |
| Denton Community Academy | Secondary | 0.9 mi | Not in the KS4 performance tables |
| St Thomas More RC College | Secondary | 1.1 mi | Progress 8 +0.43 · above average (2023/24) |
| Reddish Vale High School | Secondary | 1.1 mi | Progress 8 -0.29 · below average (2023/24) |
Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.