| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Band A condensing boiler | — | £2,200 – £3,000 | £26 | 50+ yrs | +3.2 pts |
| Solar photovoltaic panels | — | £3,500 – £5,500 | £39 | 50+ yrs | +4.7 pts |
| Floor insulation | — | £4,000 – £6,000 | £42 | 50+ yrs | +5.1 pts · reaches B |
| Solar water heating(optional, beyond B) | — | £4,000 – £6,000 | £33 | 50+ yrs | +4.0 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
The full plan saves £107 a year — a 0.9% annual return on £12,100.
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2021, states £554 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
Estimated today: £200,532 HPI-indexed estimate, not a valuation
Regent Close: 2 sales since 1995
Schools nearby
The schools’ own performance — Progress 8 shows value added, not just raw results.
| School | Phase | Distance | Progress |
|---|---|---|---|
| Woodland Community Primary School | Primary | 0.1 mi | — |
| St Joseph's Roman Catholic Primary School Rochdale, a Voluntary Academy | Primary | 0.3 mi | — |
| St Margaret's Church of England Primary School | Primary | 0.4 mi | — |
| Holy Family Roman Catholic and Church of England College | Secondary | 0.3 mi | Progress 8 -0.32 · below average (2023/24) |
| Newhouse Academy | Secondary | 0.8 mi | Progress 8 -0.36 · below average (2023/24) |
| Edgar Wood Academy | Secondary | 1.8 mi | Not in the KS4 performance tables |
Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.