2 Oddies Yard, Rochdale OL12 0AN

Enclosed Mid-Terrace house · Built before 1900 · 55 m² · Rented (Private) · Boiler and radiators, mains gas

Upgrade Plan

EB for £17,823 · £5,941 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Hot water cylinder insulation£15 – £400£1691.2 yrs+7.2 pts
Low energy lighting£15£91.7 yrs+0.4 pts
Heating controls£350 – £450£725.6 yrs+3.1 pts
Cavity wall insulation£500 – £1,500£1486.8 yrs+6.3 pts · reaches D
Room-in-roof insulation£1,500 – £2,700£2737.7 yrs+11.6 pts
Band A condensing boiler£2,200 – £3,000£12121.4 yrs+5.2 pts · reaches C
Solar water heating£4,000 – £6,000£15332.6 yrs+6.5 pts
Solar photovoltaic panels£5,000 – £8,000£18335.6 yrs+7.8 pts · reaches B

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,874
per year at grade E
£747
per year at grade B

The full plan saves £1,127 a year — a 6.3% annual return on £17,823.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2015, states £1,303 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

4 November 2014£36,500

Estimated today: £71,611 HPI-indexed estimate, not a valuation

Oddies Yard: 1 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
All Saints Church of England Primary SchoolPrimary0.1 mi
St Patrick's Roman Catholic Primary SchoolPrimary0.2 mi
Greenbank Primary SchoolPrimary0.3 mi
Falinge Park High SchoolSecondary0.7 miNot in the KS4 performance tables
Wardle AcademySecondary1.3 miProgress 8 -0.49 · below average (2023/24)
Oulder Hill Leadership AcademySecondary1.6 miProgress 8 -0.11 · average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.