1 Broad ING, Rochdale OL12 7AR

Detached bungalow · Built 1983-1990 · 67 m² · Owner-occupied · Boiler and radiators, mains gas

Upgrade Plan

DB for £11,615 · £5,808 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Loft insulation£100 – £350£494.6 yrs+2.9 pts
Low energy lighting£40£48.9 yrs+0.3 pts
Floor insulation£800 – £1,200£1029.8 yrs+6.0 pts
Wind turbine£1,500 – £4,000£8532.4 yrs+5.0 pts · reaches C
Band A condensing boiler£2,200 – £3,000£6341.3 yrs+3.7 pts
Solar water heating£4,000 – £6,000£8050+ yrs+4.7 pts · reaches B
Solar photovoltaic panels(optional, beyond B)£9,000 – £14,000£9550+ yrs+5.6 pts

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,247
per year at grade D
£769
per year at grade B

The full plan saves £383 a year — a 3.3% annual return on £11,615.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2014, states £830 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

11 September 2015£160,000

Estimated today: £308,690 HPI-indexed estimate, not a valuation

Broad Ing: 3 sales since 1995 · £185,000 average over 10 years

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Meanwood Community Nursery and Primary SchoolPrimary0.2 mi
St Vincent De Paul Roman Catholic Primary School, A Voluntary AcademyPrimary0.5 mi
Caldershaw Primary SchoolPrimary0.5 mi
Oulder Hill Leadership AcademySecondary0.3 miProgress 8 -0.11 · average (2023/24)
Falinge Park High SchoolSecondary0.6 miNot in the KS4 performance tables
Matthew Moss High SchoolSecondary1.5 miProgress 8 -0.03 · average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.