2 Roberts Place, Littleborough OL15 0BH

Enclosed End-Terrace house · Built 1900-1929 · 56 m² · Owner-Occupied · Electric storage heaters

Upgrade Plan

FB for £23,165 · £5,791 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Low energy lighting£15£111.4 yrs+0.3 pts
Flue gas heat recovery£400 – £900£2452.7 yrs+7.0 pts
Cavity wall insulation£500 – £1,500£1885.3 yrs+5.4 pts · reaches E
Change of heating system£3,000 – £7,000£7197.0 yrs+20.7 pts · reaches D
Floor insulation£4,000 – £6,000£25219.8 yrs+7.2 pts · reaches C
Solar water heating£4,000 – £6,000£19625.6 yrs+5.6 pts
Solar photovoltaic panels£5,000 – £8,000£23327.9 yrs+6.7 pts · reaches B

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£2,923
per year at grade F
£1,079
per year at grade B

The full plan saves £1,844 a year — a 8.0% annual return on £23,165.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2018, states £1,709 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

28 April 2026£112,500
9 March 2018£60,000

Estimated today: £111,419 HPI-indexed estimate, not a valuation

Roberts Place: 4 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Smithy Bridge Foundation Primary SchoolPrimary0.1 mi
St Andrew's Church of England Primary School and NurseryPrimary0.7 mi
St Mary's Roman Catholic Primary School, a Voluntary AcademyPrimary1.0 mi
Wardle AcademySecondary1.0 miProgress 8 -0.49 · below average (2023/24)
Hollingworth AcademySecondary1.6 miProgress 8 -0.02 · average (2023/24)
Kingsway Park High SchoolSecondary2.3 miProgress 8 -0.49 · below average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.