2 River Place, Milnrow, Rochdale OL16 3NF

Mid-Terrace house · Built before 1900 · 50 m² · Rented (Private) · Boiler and radiators, mains gas

Upgrade Plan

DB for £12,735 · £6,368 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Low energy lighting£10£61.7 yrs+0.3 pts
Loft insulation£100 – £350£633.5 yrs+3.7 pts
Heating controls£350 – £450£488.2 yrs+2.8 pts
Band A condensing boiler£2,200 – £3,000£8231.8 yrs+4.7 pts
Solar photovoltaic panels£3,500 – £5,500£12336.5 yrs+7.1 pts · reaches C
Solar water heating£4,000 – £6,000£10348.4 yrs+6.0 pts · reaches B
Solid wall insulation(optional, beyond B)£4,000 – £14,000£14450+ yrs+8.3 pts

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,239
per year at grade D
£669
per year at grade B

The full plan saves £426 a year — a 3.3% annual return on £12,735.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2020, states £785 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

23 July 2021£90,000
10 June 2005£89,995
14 April 2003£55,000

Estimated today: £116,640 HPI-indexed estimate, not a valuation

River Place: 4 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Milnrow Parish Church of England Primary SchoolPrimary0.1 mi
Moorhouse AcademyPrimary0.2 mi
Crossgates Primary SchoolPrimary0.4 mi
Hollingworth AcademySecondary0.4 miProgress 8 -0.02 · average (2023/24)
Kingsway Park High SchoolSecondary1.2 miProgress 8 -0.49 · below average (2023/24)
St Cuthbert's Roman Catholic High School, a Voluntary AcademySecondary1.8 miAttainment 8 39.7 · no Progress 8 published

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.