| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Hot water cylinder insulation | — | £15 – £30 | £84 | 0.3 yrs | +4.9 pts · reaches D |
| Low energy lighting | — | £35 | £4 | 8.2 yrs | +0.2 pts |
| Floor insulation | — | £800 – £1,200 | £98 | 10.2 yrs | +5.7 pts |
| Cavity wall insulation | — | £500 – £1,500 | £73 | 13.7 yrs | +4.3 pts |
| Wind turbine | — | £1,500 – £4,000 | £81 | 33.9 yrs | +4.7 pts · reaches C |
| Band A condensing boiler | — | £2,200 – £3,000 | £60 | 43.2 yrs | +3.5 pts |
| Solar water heating | — | £4,000 – £6,000 | £76 | 50+ yrs | +4.4 pts |
| Solar photovoltaic panels | — | £9,000 – £14,000 | £91 | 50+ yrs | +5.3 pts · reaches B |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
£1,392
per year at grade E
£825
per year at grade B
The full plan saves £567 a year — a 2.4% annual return on £23,908.
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2014, states £928 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
14 September 2018£111,500
21 September 2007£118,950
30 June 2005£95,400
21 September 1999£37,500
18 August 1995£37,500
Estimated today: £164,157 HPI-indexed estimate, not a valuation
Schools nearby
No school in the register within reach of this postcode.