11 Cherry Close, Stockport SK2 5EB

Detached house · Built 1996-2002 · 167 m² · Boiler and radiators, mains gas

Upgrade Plan

DC for £1,000 · £1,000 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Floor insulation£800 – £1,200£1099.2 yrs+3.6 pts · reaches C
Low energy lighting(optional, beyond C)£90£518.9 yrs+0.2 pts
Band A condensing boiler(optional, beyond C)£2,200 – £3,000£6738.9 yrs+2.2 pts
Solar water heating(optional, beyond C)£4,000 – £6,000£8450+ yrs+2.8 pts
Solar photovoltaic panels(optional, beyond C)£9,000 – £14,000£10150+ yrs+3.3 pts

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£1,933
per year at grade D
£1,568
per year at grade C

The full plan saves £109 a year — a 10.9% annual return on £1,000.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2012, states £1,133 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

29 May 2020£553,000
21 August 2015£380,000
1 April 2005£375,000
19 December 2003£352,000
27 October 2000£249,950

Estimated today: £737,102 HPI-indexed estimate, not a valuation

Cherry Close: 20 sales since 1995 · £504,000 average over 10 years

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Fairway Primary SchoolPrimary0.2 mi
Dial Park Primary SchoolPrimary0.3 mi
St Philip's Catholic Primary School, a Voluntary AcademyPrimary0.3 mi
Stockport SchoolSecondary1.0 miProgress 8 +0.25 · above average (2023/24)
Werneth SchoolSecondary1.1 miProgress 8 -0.45 · below average (2023/24)
Harrytown Catholic High SchoolSecondary1.2 miProgress 8 -0.32 · below average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.