2 Rose Bank Close, Wigan WN1 2QU

Detached house · Built 1996-2002 · 136 m² · Rented (Private) · Boiler and radiators, mains gas

Upgrade Plan

DC for £7,725 · £7,725 a gradeGet upgrade quotes
MeasureGrantNet costSaving / yrPaybackGrade effect
Loft insulation£100 – £350£762.9 yrs+2.3 pts
Heating controls£350 – £450£586.8 yrs+1.8 pts
Band A condensing boiler£2,200 – £3,000£9926.4 yrs+3.0 pts
Solar photovoltaic panels£3,500 – £5,500£14930.3 yrs+4.5 pts · reaches C
Floor insulation(optional, beyond C)£4,000 – £6,000£16031.2 yrs+4.8 pts
Solar water heating(optional, beyond C)£4,000 – £6,000£12540.2 yrs+3.7 pts

Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.

Running costs

£2,167
per year at grade D
£1,500
per year at grade C

The full plan saves £382 a year — a 4.9% annual return on £7,725.

Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2019, states £1,374 a year at the prices assumed then. Modelled costs, not a bill.

Sold prices

22 June 2021£200,000
26 November 2007£295,000

Estimated today: £256,973 HPI-indexed estimate, not a valuation

Rose Bank Close: 7 sales since 1995

Schools nearby

The schools’ own performance — Progress 8 shows value added, not just raw results.

SchoolPhaseDistanceProgress
Woodfield Primary SchoolPrimary0.2 mi
Beech Hill Community Primary SchoolPrimary0.6 mi
Sacred Heart Catholic Primary SchoolPrimary0.7 mi
St John Fisher Catholic High SchoolSecondary0.8 miProgress 8 -0.58 · well below average (2023/24)
The Deanery Church of England High School and Sixth Form CollegeSecondary1.0 miProgress 8 -0.31 · below average (2023/24)
Dean Trust Rose BridgeSecondary1.6 miProgress 8 -0.60 · well below average (2023/24)

Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.

Energy data © Crown copyright, EPB Register© HM Land Registry, OGL v3We grade homes, never neighbourhoods.