| Measure | Grant | Net cost | Saving / yr | Payback | Grade effect |
|---|---|---|---|---|---|
| Hot water cylinder insulation | — | £200 – £400 | £136 | 2.2 yrs | +4.2 pts · reaches D |
| Low energy lighting | — | £35 | £7 | 5.0 yrs | +0.2 pts |
| Floor insulation | — | £800 – £1,200 | £159 | 6.3 yrs | +4.9 pts |
| Cavity wall insulation | — | £500 – £1,500 | £119 | 8.4 yrs | +3.7 pts |
| Flat roof insulation | — | £850 – £1,500 | £121 | 9.8 yrs | +3.7 pts |
| Band A condensing boiler | — | £2,200 – £3,000 | £98 | 26.7 yrs | +3.0 pts · reaches C |
| Solar photovoltaic panels(optional, beyond C) | — | £3,500 – £5,500 | £147 | 30.6 yrs | +4.5 pts |
| Solar water heating(optional, beyond C) | — | £4,000 – £6,000 | £123 | 40.6 yrs | +3.8 pts |
Grants verified 20 August 2026. Costs are the register’s indicative ranges. Savings are restated at the fuel prices assumed in July 2026. Points per measure are estimated from 19.9 million certificates and rescaled to this home’s own certificate delta; the total is the register’s figure.
Running costs
The full plan saves £638 a year — a 10.4% annual return on £6,110.
Restated at the fuel prices assumed in July 2026. This certificate, assessed in 2021, states £1,390 a year at the prices assumed then. Modelled costs, not a bill.
Sold prices
No sale recorded for this address since 1995.
Danesbury Road: 29 sales since 1995 · £159,364 average over 10 years
Schools nearby
The schools’ own performance — Progress 8 shows value added, not just raw results.
| School | Phase | Distance | Progress |
|---|---|---|---|
| St Columba's RC Primary School | Primary | under 0.1 mi | — |
| Castle Hill Primary School | Primary | 0.5 mi | — |
| Sharples Primary School | Primary | 0.6 mi | — |
| Canon Slade School | Secondary | under 0.1 mi | Progress 8 +0.29 · above average (2023/24) |
| Sharples School | Secondary | 0.7 mi | Progress 8 +0.86 · well above average (2023/24) |
| Turton School | Secondary | 0.9 mi | Progress 8 +0.08 · average (2023/24) |
Schools from the DfE register, performance from the KS4 performance tables. Progress 8 is a GCSE measure, so primaries have none. Distance is straight-line from the postcode, not a catchment: admission is decided by the school, not by us.
Danesbury Road
How this home sits against its street.